
BME Utility Infrastructure
BME completes design plans for water and sanitary sewer system improvements for new construction as well as system rehabilitations and upgrades. BME also completes the associated modeling and calculations for flows and capacities, including fire flow analysis on water distribution systems. BME also completes designs for wastewater lift stations.
BME Utility Projects

26th Street Storm
$2m in Stormwater
Management

CRMC Storm
1.4m in Stormwater
Management

The Pointe Lift Stations
Serves 655 Residential Lots

Burns Storage Tank
Serves 254 Residents
- The Pointe Lift Stations
- 26th Street Storm Sewer
- Cheyenne Regional MC Storm Sewer
- Waterford Lift Stations
- Albin Water Projects
- Albin Sewer Projects
- Lingle Sewer Lagoon
- Burns Storage Tank
- Bell Well Field Backflow Prevention
- LCCC Sewer Mains
- LCCC Water Mains
- LCCC Irrigations
- Burns Lift Station
- Pine Bluffs Lift Station
- Albin Water Booster Station
Cheyenne Transfer Station Lift Station